Six-stage factory: forming line, ball handling, spray booth, press-rolling, warehouse, dispatch
Forming line · ball handling · spray booth · press-rolling · warehouse · dispatch

3,000 m². Two lines. One product family.

Six stages under one roof. 6,000+ balls a day, about 150,000 a month.

6,000+balls a day
150,000balls a month
3,000m² of workshop

Seven stages

  1. Body formed on our line
  2. Rested and sorted by colour lot
  3. Sprayed and evened by hand
  4. Press-rolled — this sets the bounce
  5. Checked: print, cover, bounce
  6. Warehoused by order
  7. Packed, marked, loaded

Output by size

SizePer day, one size
18 cm4,200
15 cm2,000
14 cm2,000
11 cm2,200

Two lines on a mixed order: 6,000+ a day.

Lead time

OrderProduction days
5,000 pcs1–2
10,000 pcs2–3
20,000 pcs4–5
30,000 pcs5–8

Add material preparation and packing. The line schedule comes with the quote.

Foam moulding line with operators loading moulds
Moulds on the line. This is where the quiet starts — the body, not the cover.
Bags of finished silent footballs waiting for packing
Finished footballs bagged by colour, waiting on the packing shift.

Audited

QIMA-audited. Summary on request. Your own inspection before shipment is welcome.

Shipping

FOB Ningbo or Shanghai. Carton size, weight and container load confirmed per order.

Send the size and the quantity.

You get a price and a production date, usually within one working day.

ljw@gohipi.com